The short answer

Commercial construction and development loans in Australia come from banks, non-bank construction lenders and private lenders. Banks want experienced builders, pre-sales or pre-leases and strong equity. Non-bank and private lenders accept more risk on pre-sales and borrower history, at a higher cost. All of them release funds in stages against progress, check the builder and contract closely, and need a clear exit at completion.

On this page · 11 sections
  1. Which lenders fund construction projects?
  2. How does a construction loan work?
  3. What does a construction lender assess?
  4. Why do construction loans get declined?
  5. What about builders and trades needing working capital?
  6. How do you prepare a construction finance application?
  7. What does a quantity surveyor’s report mean for you?
  8. Quick checklist before you approach a construction lender
  9. Construction finance for builders versus developers
  10. The cash-flow squeeze in construction
  11. Planning a build?

Key points

  • Funds are released in progress draws, usually after a quantity surveyor checks the work.
  • Lenders assess the project, the builder, the contract, the equity and the exit.
  • Banks are strictest on pre-sales, pre-leases and experience; non-banks and private lenders are more flexible.
  • Trade businesses' working capital is a separate need — see invoice and working capital finance.

Key facts

Drawdowns
Staged against progress
Main lenders
Banks, non-bank, private
Key tests
Builder, equity, exit

Construction lending is a specialist corner of the market. A lender isn’t just lending against a business or a property; it’s lending against something that doesn’t exist yet. That changes everything about how the deal is assessed, how funds are released and which lenders are willing to take it on.

This page covers construction and development projects — building or substantially renovating commercial, industrial, mixed-use or multi-unit property. If you’re a builder or trade contractor needing working capital between progress payments, skip to the section near the end.

Which lenders fund construction projects?

Lender type Appetite Typically wants
Major and regional banks Lower-risk projects, experienced developers Strong pre-sales or pre-leases, significant equity, fixed-price contract
Non-bank construction lenders Mid-size projects, more flexibility Fewer pre-sales, solid equity, credible builder
Private lenders Smaller or time-critical projects, residual stock, land Clear exit, conservative loan-to-value
Mezzanine and preferred-equity funders Topping up senior debt Higher return, sits behind the main lender

How does a construction loan work?

  1. Approval based on the land, plans, permits, budget, contract and feasibility.
  2. Land or initial advance, sometimes refinancing existing land debt.
  3. Progress draws at agreed stages — slab, frame, lock-up, fixing, completion — each checked by the lender’s quantity surveyor.
  4. Cost-to-complete tests before each draw: the remaining facility must cover the rest of the build.
  5. Exit at completion: sale of units, refinance to an investment loan, or a lease-backed commercial facility.

Interest is often capitalised during the build, adding to the balance rather than being paid monthly.

What does a construction lender assess?

  • The builder. Licence, track record, financial strength and the building contract (fixed-price contracts are preferred).
  • The project. Plans, permits, location, the type of property and demand for it.
  • The numbers. Budget, contingency, feasibility and the margin if things go wrong.
  • Your equity. How much of your own money is in the deal.
  • Pre-sales or pre-leases. Especially for banks.
  • The exit. Sales, refinance or lease, and how realistic each is in the current market.

Have a project in mind and wondering which part of the market will take it? Talk it through with a specialist — there’s no credit check to ask.

Why do construction loans get declined?

  • Not enough equity once costs and contingency are counted.
  • A builder with limited experience or financial strength, or a cost-plus contract.
  • Pre-sales below the lender’s requirement.
  • Permits not in place.
  • A feasibility that relies on optimistic sale prices.
  • An exit that depends on a refinance the borrower may not qualify for.

What about builders and trades needing working capital?

Builders, subcontractors and trade businesses often face a different problem: paying for labour, materials and plant weeks before a progress payment or claim is paid, with retentions held back on top. That isn’t a construction loan; it’s a cash-flow need. Lender types that commonly help:

See who lends for working capital for more detail.

How do you prepare a construction finance application?

Assemble a single pack: plans and permits, the building contract, the builder’s credentials, a detailed budget with contingency, a feasibility, evidence of your equity, pre-sale or pre-lease contracts, and your exit plan. A complete, well-organised pack is the biggest single factor in how smoothly a construction application runs. Small businesses should also be aware that standard-form contracts, including loan contracts, are covered by unfair contract term protections that ASIC administers.

What does a quantity surveyor’s report mean for you?

Before each drawdown, the lender’s quantity surveyor checks the work against the budget and the stage claimed. If the builder has claimed more than the work completed, or if the cost to complete now exceeds the undrawn facility, the draw can be reduced or held until you fund the difference. That’s why a realistic contingency and an experienced builder matter so much: they keep the draws flowing on schedule and protect you from funding shortfalls mid-build.

Quick checklist before you approach a construction lender

  • Approved plans and permits.
  • The signed building contract and the builder’s licence and track record.
  • A detailed budget with contingency and a feasibility study.
  • Evidence of your equity and any pre-sales or pre-leases.
  • A written exit plan: sale, refinance or lease.
  • Your own experience with similar projects, if any.

A lender who receives this pack complete on day one can usually give you a clear indication quickly. A lender who has to chase each item will take longer and may assume the project is less organised than it is.

Finally, remember that a construction facility is usually only one part of the funding. Land settlement, professional fees before the build starts, and holding costs after completion all need to be covered too. Ask your lender which of these it will fund and plan your own cash for the rest.

Construction finance for builders versus developers

Construction finance means different things to different borrowers. A developer building townhouses or a commercial building needs a construction loan that funds the project in stages against a quantity surveyor’s progress reports, with presales or leasing pre-commitments supporting the exit, and the developer’s own equity sitting in the project from day one. A builder or trade business working on other people’s projects rarely needs that; it needs working capital to cover wages, materials and subcontractors between progress claims, plus equipment finance for gear.

Borrower Usual finance What lenders focus on
Developer (owner of the project) Construction loan, mezzanine, bridging Feasibility, presales, builder quality, exit
Builder or head contractor Line of credit, invoice finance, equipment finance Contract terms, retentions, ATO position
Trades and subcontractors Equipment finance, short-term loans Cash flow between claims, customer quality

The cash-flow squeeze in construction

Builders and trades often carry costs for weeks before a claim is paid, and then wait months for retentions. That’s why the RBA’s October 2026 Financial Stability Review flags construction among the industries with elevated insolvencies. Lenders know it, so they look closely at contract payment terms, how much is owed to subcontractors and suppliers, and whether BAS and super are up to date. Keeping a simple weekly cash-flow forecast for each live job — what’s owed to you, what you owe, and when — is the single most persuasive document a builder can show a lender, because it proves you understand your own squeeze. A facility that matches the claim cycle — such as invoice finance on commercial contracts or a line of credit sized to your peak outlay — usually serves better than a lump-sum loan. Our builders and tradies guide covers the trade side in depth, and a specialist can help structure it.

Planning a build?

Construction finance rewards early preparation. Send a 60-second enquiry outlining the project and your equity, and a lending specialist will tell you which lender type is realistic and what it will need to see. No credit check to ask, your project details aren’t sent to a crowd of lenders, and the more accurately you describe the build, the better we can match it first time.

Frequently asked questions

What is a commercial construction loan?

It's finance to build or substantially renovate commercial, industrial, mixed-use or multi-unit property. Funds are drawn in stages as the work progresses rather than paid out in one lump sum.

Do I need pre-sales for development finance?

Banks usually require a meaningful level of pre-sales or pre-leases for residential and commercial developments. Non-bank and private lenders may accept fewer or none, generally with more equity and at a higher cost.

Who checks the progress before each drawdown?

Usually an independent quantity surveyor appointed by the lender, who confirms the work has been completed and that the remaining funds will cover the rest of the build.

Can a builder get finance for working capital rather than a project?

Yes, but that's a different product. Builders and subcontractors often use invoice finance, lines of credit or property-backed loans to manage the gap between paying for labour and materials and receiving progress payments.

What happens if the build runs over budget?

Lenders typically require you to fund cost overruns yourself before more loan funds are released. That's why they check the contract, contingency and your equity so closely at the start.

Sources we checked

General information only, current at 5 October 2026. We don't publish interest rates: every business loan is priced on the borrower's own circumstances.

Ready when you are

See what your business could qualify for

One short enquiry, no credit check when you first enquire, and a real person who calls you back with options that fit.

No credit check to ask

Asking what you could get leaves your credit file alone. A check only happens later, with a lender you've chosen, and you'll know before it does.

Not sprayed to a list

Your enquiry isn't auctioned or blasted to a crowd of lenders. We work out where it belongs and take it to that lender properly.

A real person on your file

Someone who knows the Australian lending market reads your details and calls you. Accurate answers on the form mean the right match first time.